Direct: (415) 254-8437

  • Home
  • GALLERIES
  • Our Process
  • Color Guide
  • The Materials
  • Case Studies
  • CONTACT
  • More
    • Home
    • GALLERIES
    • Our Process
    • Color Guide
    • The Materials
    • Case Studies
    • CONTACT

Direct: (415) 254-8437

  • Home
  • GALLERIES
  • Our Process
  • Color Guide
  • The Materials
  • Case Studies
  • CONTACT

our process

Site Assessment

Takeoffs and Estimating

Takeoffs and Estimating

We start by understanding and assessing the unique conditions of your substrate, determining whether any remedial steps are necessary to receive coatings. 

Takeoffs and Estimating

Takeoffs and Estimating

Takeoffs and Estimating

Our professional team of estimators will review construction documents for accurate take-offs of areas and materials. 

Design Consultation

Takeoffs and Estimating

Substrate Preparation

You're in control of the design process. We provide standard or custom, full flake, partial flake or tinted top coat options. We customize each floor to your unique tastes and project conditions. 

Substrate Preparation

Application of Base Coat

Substrate Preparation

During our preparation phase, we remove any loose coatings, fill pop-outs and cracks, and prepare the floor for optimal adhesion of our coatings. 

Application of Base Coat

Application of Base Coat

Application of Base Coat

The base coat is applied in a variety of colors. This is our secret sauce - the truly awesome material that is thicker and outperforms traditional epoxies. This material has zero-VOCs and self-levels which is great at filling small imperfections

Flake Broadcast

Application of Base Coat

Application of Base Coat

Your floor design comes to life in this stage where the flake or quartz broadcast is applied. This is achieved just after the base coat is applied. This layer gives slip resistance, texture and visual interest to the floor.

Application of Top Coat

Application of Top Coat

Application of Top Coat

After 12-24 hours, we apply our super-tough, industry leading, UV stable, chemical resistant, hot-tire resistant top coat. This top coat WILL NOT FADE OR YELLOW and gives a nice glossy appearance to the finished floor. 

Return to Service

Application of Top Coat

Application of Top Coat

At 24 hours, you can walk on your new floor. After 48 hours, your floor is fully cured and ready to return to vehicle service. At 3-4 days, you can wash your new floor as needed. 


Copyright © 2019 Awesome Materials, LLC - All Rights Reserved.

  • Color Guide
  • The Materials
  • Case Studies
  • CONTACT

This website uses cookies.

We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.

DeclineAccept